SC&W Layout Electrical Manual -   XIII. - Auxiliary Circuits


SWAMP CREEK & WESTERN
RAILROAD ASSOCIATION

211 Railroad Ave. Edmonds, WA 98020

OFFICIAL POSTS   CONSTITUTION   BY-LAWS   STANDARDS AND PROCEDURES   NEWS AND CALENDAR   CONSTRUCTION   STRUCTURES   TRACK WARRANTS   ELECTRICAL   BULLETIN BOARD   ROSTER   LINKS   HOME  

LAYOUT ELECTRICAL MANUAL

Established December 5, 2000

Revised by page

XIII. - AUXILIARY CIRCUITS

Layout Electrcial Manual Index

  1. General Wiring Practices

  2. Layout

  3. Control Panels

  4. Power Supplies

  5. Conventional DC Throttles

  6. DCC - Digital Command Control

  7. Power Block Selectors for the Layout

  8. Switch Motors, Machines and Turnouts    

  9. Return Loop Circuits

  10. Gorge By-Pass Circuits

  11. Hidden Track Detection Circuits

  12. Signaling

  13. Auxiliary Circuits

    1. Throttle and Bench Power Indicator Lamps

  14. Layout Schematics

  15. Layout and Room Lighting


XIII. AUXILIARY CIRCUITS:



A.   THROTTLE AND BENCH POWER INIDCATOR LAMPS:

The indicator lamps at the far end of the West End peninsula near the entry door are powered by 16 volt (doorbell) transformers located behind the throttle 120 volt on/off switches. There is one lamp for each of the two throttle circuits and one for the bench power. The transformers are connected to these circuits on the high voltage side by means of power cords plugged into the corresponding circuits. In the case of the bench power this is at the first receptacle in the circuit. One should be careful so as not to plug the cords into the wrong circuits and thus cause confusion. They are labeled.

The lamps are 12 volt and thus burn too bright and hot with the 16 volt supply. To dim them 100 ohm resistors have been added to the circuits near the lamps to drop the voltage.

Each of the transformers is wired independently, within one junction box, right behind the on-off switches by Coldwater. The grounds are connected together, connected to the transformer box, and to the common ground via the throttle box.



  To Next Section - XIV. LAYOUT SCHEMATICS         Return to Electrical Manual Index  


OFFICIAL POSTS   CONSTITUTION   BY-LAWS   STANDARDS AND PROCEDURES   NEWS AND CALENDAR   CONSTRUCTION   STRUCTURES   TRACK WARRANTS   ELECTRICAL   BULLETIN BOARD   ROSTER   LINKS   HOME  

SWAMP CREEK & WESTERN
RAILROAD ASSOCIATION

211 Railroad Ave. Edmonds, WA 98020