SC&W Layout Electrical Manual - XIV. - Layout Schematics
SWAMP CREEK & WESTERN
| ||||||||||||||||||||||||||||
| OFFICIAL POSTS CONSTITUTION BY-LAWS STANDARDS AND PROCEDURES NEWS AND CALENDAR CONSTRUCTION STRUCTURES TRACK WARRANTS ELECTRICAL BULLETIN BOARD ROSTER LINKS HOME | ||||||||||||||||||||||||||||
LAYOUT ELECTRICAL MANUALEstablished December 5, 2000Revised by page | ||||||||||||||||||||||||||||
XIV. - LAYOUT SCHEMATICS | ||||||||||||||||||||||||||||
XIV. LAYOUT SCHEMATICS:A. TRACK SCHEMATIC DRAWINGS: to be developed - future outline shown The purpose of these drawings is to identify track and switches, and uniformly designate same for such purposes as electrical, mechanical, operational and maintenance. These drawings are contained in Section II. Layout of this manual. The following Electrical Schematics are based on the TS drawing. B. TRACK SCHEMATIC DRAWINGS - STATION DESIGNATIONS: Refer to the Station Designations index in Section II. Layout as well. They shall be applied to these documents for the purpose of the uniform identity. C. ELECTRICAL SCHEMATIC DRAWINGS - INDEX: ES-1 ORCHARD YARD - EASTES-2 ORCHARD YARD - WEST ES-3 LONE TREE ES-4 RIMROCK - EAST ES-5 RIMROCK - WEST ES-6 TUMWATER MINING CO. - BRANCH ES-7 DUDMAN'S CURVE, DUCK LAKE, EAST PORTAL ES-8 METHVEN SUMMIT ES-9 GILMAN, MOUNTAIN ES-10 COLDWATER ES-11 CASCADE TIMBER CO. - BRANCH ES-12 CROW CREEK ES-13 MT. BRYNION ES-14 PORT COLUMBIA - EAST ES-15 WILLOW GROVE YARD - EAST ES-16 WILLOW GROVE YARD - WEST ES-17 GORGE ES-18 HOLDEN ES-19 WAITSBURG ES-20 ELECTRICAL TEST BENCH D. ELECTRICAL SCHEMATIC DRAWINGS - TURNOUT DESIGNATIONS: Switches will be designated as follows: AA-B-n. "AA"= Station designation, see above.
"B"= E, W, B, X, Y or Z "n"= turnout number, East and West turnouts of same siding should have same number. E. ELECTRICAL SCHEMATIC DRAWINGS - Description and Purpose: The purpose of these drawings is to document the layout wiring for general reference, maintenance and fault locating. The Electrical Schematic (ES) drawings mimic the Track Schematic (TS) drawings as previously described in their designations and organization. The ES drawings are subdivided by the type of wiring. Such drawings are indicated by the following alpha suffix: ELECTRICAL SCHEMATIC DRAWINGS - SUB-TOPICS
F. ELECTRICAL SCHEMATIC DRAWINGS - SYMBOLOGY: NOTE: THESE ARE NOT YET OFFICIALLY ADOPTED Unfortunately the web version does not support the chosen symbols. In order to properly view these you will have to download the WORD documents. The ES drawings use symbology to depict standardized wiring. The following legend gives all the symbols, their associated hardware and the applicable Standardized Wiring Chart number:
G. ELECTRICAL SCHEMATIC DRAWINGS - STANDARDIZED CHARTS (ES-C): ES-C-A TRACK POWER ES-C-B SWITCH MACHINE ES-C-C THROTTLE CONTROL H. ELECTRICAL SCHEMATIC DRAWINGS - NON-STANDARD CHARTS (ES-CX): to be developed
| ||||||||||||||||||||||||||||
| OFFICIAL POSTS CONSTITUTION BY-LAWS STANDARDS AND PROCEDURES NEWS AND CALENDAR CONSTRUCTION STRUCTURES TRACK WARRANTS ELECTRICAL BULLETIN BOARD ROSTER LINKS HOME | ||||||||||||||||||||||||||||
SWAMP CREEK & WESTERN
|